Appendix C

Appendix C: Operational Checklists

Six operational checklists for migration phases. Each item includes the responsible role and a verification method. Print or copy to your project wiki before each phase.


Checklist 1: Pre-Assessment

Purpose: Confirm that the Oracle source system is accessible and ready for assessment before running any assessment queries.

# Item Owner Verification
1 Oracle JDBC connectivity confirmed from pipeline host Migration Eng SELECT 1 FROM DUAL via JDBC
2 Oracle user with read access to DBA_* views granted Oracle DBA SELECT COUNT(*) FROM DBA_TABLES succeeds
3 V$SQL and V$SESSION accessible (for workload analysis) Oracle DBA SELECT COUNT(*) FROM V$SESSION succeeds
4 DBA_SOURCE accessible (for PL/SQL inventory) Oracle DBA SELECT COUNT(*) FROM DBA_SOURCE succeeds
5 Oracle version confirmed (19c / 21c / 23c) Oracle DBA SELECT VERSION FROM V$INSTANCE
6 Schema owner(s) confirmed and documented Migration Eng List of schemas in scope agreed with App team
7 Table exclusion list agreed (staging tables, temp tables, etc.) App Eng Written exclusion list reviewed by both teams
8 Assessment output destination confirmed (path/bucket) Migration Eng Write test to output location succeeds
9 Estimated schema size reviewed (table count, row counts) Migration Eng SELECT COUNT(*) FROM DBA_TABLES WHERE OWNER = :schema
10 Assessment timeline communicated to Oracle DBA (will run queries) PM Calendar entry / Slack confirmation

Checklist 2: Pre-Full-Load

Purpose: Confirm that all prerequisites are in place before starting the full data load.

# Item Owner Verification
1 Pre-load DDL applied to PostgreSQL target PG Eng \dt in psql shows all tables (no constraints yet)
2 Sequences created in PostgreSQL (not advanced yet) PG Eng \ds shows all sequences starting at 1
3 PostgreSQL WAL settings tuned for bulk load PG Eng SHOW synchronous_commit; returns off
4 Oracle supplemental logging enabled for all in-scope tables Oracle DBA SELECT * FROM DBA_SUPPLEMENTAL_LOGGING all rows show Y
5 Anchor SCN recorded and stored in staging ledger Migration Eng SELECT anchor_scn FROM _pulsaride.full_load_config
6 Oracle UNDO_RETENTION sufficient for load duration Oracle DBA SHOW PARAMETER UNDO_RETENTION > estimated load hours × 3600
7 Pipeline worker count configured and tested (benchmark run) Migration Eng Benchmark command completed, throughput documented
8 LOB-heavy tables configured with reduced chunk size Migration Eng Config YAML reviewed, LOB tables have chunkSize ≤ 5000
9 Staging ledger tables created Migration Eng SELECT COUNT(*) FROM _pulsaride.full_load_status succeeds
10 Monitoring dashboard accessible Migration Eng /pulsaride/dashboard loads in browser
11 Estimated full load duration communicated to Oracle DBA PM Slack/email with estimated duration
12 Archive log retention verified for load duration + 24h Oracle DBA SHOW PARAMETER DB_RECOVERY_FILE_DEST_SIZE and retention policy

Checklist 3: Pre-CDC

Purpose: Confirm that the CDC pipeline is ready to start consuming Oracle redo logs from the anchor SCN.

# Item Owner Verification
1 Full load confirmed complete (all tables, all chunks COMPLETE) Migration Eng SELECT status FROM _pulsaride.full_load_status WHERE status != 'COMPLETE' returns 0 rows
2 Partial write detection run (no chunks with rows_loaded ≠ rows_expected) Migration Eng SELECT * FROM _pulsaride.full_load_status WHERE rows_loaded != rows_expected returns 0 rows
3 Post-load DDL applied (constraints and indexes) PG Eng \d account shows PRIMARY KEY, FOREIGN KEY, indexes
4 Sequence advancement applied PG Eng SELECT last_value FROM account_seq > max(account_id) in account
5 CDC connector configured (LogMiner or Debezium) Migration Eng CDC config YAML reviewed, connection test passed
6 Anchor SCN confirmed in CDC configuration Migration Eng startScn in CDC config matches staging ledger anchor_scn
7 Oracle archived log availability for anchor SCN Oracle DBA SELECT * FROM V$LOG_HISTORY WHERE FIRST_CHANGE# <= :anchor_scn shows log exists
8 CDC consumer Kafka topics created (if Debezium) Migration Eng kafka-topics.sh --list shows topics for all in-scope tables
9 PostgreSQL WAL settings restored to durable mode PG Eng SHOW synchronous_commit; returns on
10 CDC lag monitoring alert configured Migration Eng Alert fires on test event (set lag threshold to 0, confirm alert, reset)

Checklist 4: Pre-Reconciliation

Purpose: Confirm that reconciliation can start and will produce meaningful results.

# Item Owner Verification
1 CDC lag < 5 minutes (target: < 30 seconds for reconciliation to be meaningful) Migration Eng pulsaride_cdc_lag_seconds < 300
2 Reconciliation configuration YAML reviewed Migration Eng All tables in scope have reconciliation mode configured
3 Normalization rules configured for known column patterns Migration Eng email: lowercase, phone: E164, CHAR columns: rtrim
4 Blocking vs advisory thresholds set for each table tier Migration Eng financial tier: blockingThresholds.countDeltaAbsolute=0
5 Reconciliation queries tested against Oracle (no performance issues) Oracle DBA Sample reconciliation query runs in < 60s on largest tables
6 False positive baseline established (first run expected discrepancies documented) Migration Eng First run output reviewed, expected false positives noted
7 Compensating write approval workflow confirmed Migration Lead Who approves? What is the SLA for approval? Documented.
8 Reconciliation alert routing confirmed Migration Eng Test alert reaches correct Slack channel and PagerDuty

Checklist 5: Pre-Cutover (Go/No-Go)

Purpose: The final gate before the cutover maintenance window opens. All items must be confirmed.

# Item Owner Verification
1 CDC lag < 30 seconds for all tables Migration Eng Dashboard: all tables < 30s lag for past 4 hours
2 Zero RED tables in reconciliation dashboard Migration Eng Dashboard: 0 RED, 0 unexpected YELLOW
3 SLA gate: financial tables clean for 24 hours Migration Eng _pulsaride.sla_gates all PASSING
4 Schema parity: zero open SCHEMA_DRIFT findings Migration Eng _pulsaride.schema_changes all applied=TRUE
5 Sequence advancement documented (values confirmed) PG Eng Written record of pre-advancement and post-advancement values
6 Zero ORPHANED_EVENT findings Migration Eng _pulsaride.orphaned_events count = 0
7 Application functional test suite PASSED on PostgreSQL App Eng Test run output attached to go/no-go document
8 Application performance test PASSED (p99 latency acceptable) App Eng Load test report attached
9 Rollback pipeline configured and dry-run completed Migration Eng Reverse replication dry run log attached
10 Maintenance window notifications sent PM Email/Slack confirmation, all stakeholders ack'd
11 Oracle DBA available for cutover window Oracle DBA Calendar hold confirmed
12 Business sponsor sign-off obtained PM Written (email) approval from CTO/Director
13 Cutover runbook reviewed by all core team members All Each person confirms they read the runbook
14 Rollback decision authority confirmed PM "If X happens, [person] has authority to call rollback" documented

Checklist 6: Post-Cutover (First 48 Hours)

Purpose: Confirm that the migrated system is stable and Oracle is safely archived.

# Item Owner Time
1 Application error rate within normal bounds App Eng T+30 min
2 PostgreSQL write throughput matches expected (no bottleneck) PG Eng T+30 min
3 Zero application-reported data issues App Eng T+4 hours
4 PostgreSQL slow query log reviewed PG Eng T+24 hours
5 Rollback window closed (documented time) Migration Eng T+4 hours
6 Reverse replication pipeline stopped Migration Eng After rollback window closes
7 Oracle put into read-only mode Oracle DBA After rollback window closes
8 Staging ledger tables archived (pg_dump to cold storage) PG Eng T+48 hours
9 pulsaride-monitoring dashboard bookmarked for operations team Migration Eng T+2 hours
10 Alert thresholds adjusted for production operation (vs migration) Migration Eng T+24 hours
11 Oracle decommission date set PM T+48 hours
12 Migration retrospective scheduled PM T+48 hours (meeting at day 30)